×

permeable material meaning in English

导磁物质
渗透性材料
透水材料

Examples

  1. The distribution among the little attendants permeable material extraction alone jade carved pine , water spray , and the quiet river boat in the boat to admire the view of the poet , carving vivid characters , the characters formed a lively you cliff map
    中间分布的点点翠色透水料独玉摘雕松树,流水浪花以及河面上静静的小船,船上的诗人赏景,人物雕刻生动,组成了一幅气韵生动的游赤壁图。
  2. Finally , this paper brings forward the mix integrated design method of asphalt treated permeable material incorporating the results of structure analyses and tests . and the rational proposal and requirement for pavement subsurface drainage system of test road is suggested
    结合结构分析与室内试验分析的结果,提出了沥青稳定碎石排水层混合料的综合设计方法,并实际运用于试验路的结构设计和排水系统设计。
  3. The distribution among the little white permeable material alone pick carved jade tree , water spray , and the quiet river boats , three friends on board vessels on road , heart - to - heart to admire the view , carving vivid life , artistically composed of a lively night chibi map
    中间分布的点点白色透水料独玉摘雕松树,流水浪花以及河面上静静的小船,三位友人船上船论道,赏景谈心,人生雕刻生动,组成了一幅气韵生动的夜游赤壁图。
  4. A brief introduction is given to the treatment of the zeya dam foundation , principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir . as for the excavation of the sand - gravel zones , except the toe slab and its 1 / 9 bottom width down stream , the alluvial layers are excavated to the micro - weathered rocks , while the other sections remain unexcavated . regarding to the treatment of the fracture zones , concrete filling is used for the toe slabs and semi - permeable materials are used for other section . according to the construction characteristics , a filter is placed in the down stream embankment foot . to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted . as a result safety , economic benefit , convenience in construction and good performace are achieved
    简要论述泽雅水库面板堆石坝坝基处理和防渗的原则及设计要点.趾板基础和堆石体各区砂砾石基础开挖,除趾板与其下游1 / 9底宽范围以及坝脚挖除冲积层至弱风化(局部微风化)基岩外,其余部分均予以保留.断层破碎带处理,趾板部位采用混凝土塞,其它部位采用半透水料置换,并根据本工程特点在下游坝脚加设了反滤层.为提高坝基的整体性和防渗性能,对趾板进行了固结和帷幕灌浆.达到了安全、经济、便于施工的目的,运行情况良好,可为面板堆石坝的设计和研究提供参考与借鉴
  5. Considering that the ferrite core is often made from good permeable material , the dissertation presents the condition that the normal component of the magnetic field strength is zero approximately at the inside surface of good permeable material , i . e . bn = 0 to determine the eigenvalues for the separation constant . during the solving process , the solenoid coil is supposed to be wound closely by infinite symmetrical delta - coils
    考虑到磁芯通常是由导磁性能非常好的软磁材料构成,本文提出利用靠近良导磁材料内侧磁场强度法向分量近似为零,即b _ n 0 ,这一边界条件,来确定边值问题中的本征值。
More:   Next

Related Words

  1. permeable
  2. permeable bed
  3. permeable seed
  4. permeable aquifer
  5. permeable medium
  6. permeable base
  7. permeable boundary
  8. permeable dike
  9. permeable soil
  10. permeable rock
  11. permeable level
  12. permeable mass
  13. permeable materials
  14. permeable media
PC Version

Copyright © 2018 WordTech Co.